CVE-2026-89465 in Linuxالمعلومات

الملخص

بحسب MITRE • 12/09/2026

In the Linux kernel, the following vulnerability has been resolved:

power: supply: rt9455: quiesce delayed work before teardown

The threaded IRQ handler can queue pwr_rdy_work, max_charging_time_work and batt_presence_work. pwr_rdy_work and batt_presence_work can also queue max_charging_time_work, while batt_presence_work can requeue itself.

rt9455_remove() cancels max_charging_time_work before batt_presence_work. The latter can therefore queue max_charging_time_work after it has already been cancelled:

rt9455_remove() workqueue cancel pwr_rdy_work cancel max_charging_time_work batt_presence_work queues max_charging_time_work cancel batt_presence_work return devres frees rt9455_info max_charging_time_work dereferences rt9455_info

The IRQ also remains registered until devres cleanup and can queue more work after any of the cancellation calls. If rt9455_hw_init() fails after the IRQ has been requested, probe returns without cancelling work that may already have been queued. A pending callback can then access rt9455_info after it has been freed.

Register rt9455_cancel_all_delayed_works() through devm_add_action_or_reset() right after devm_power_supply_register(). devres invokes the action in reverse registration order, after the managed IRQ has been freed and before rt9455_info is released, so the delayed works are drained in both rt9455_remove() and the probe error path. Cancel pwr_rdy_work and batt_presence_work before max_charging_time_work because both can queue the latter.

This issue was found by an in-house static analysis tool.

If you want to get the best quality for vulnerability data then you always have to consider VulDB.

مسؤول

Linux

حجز

11/09/2026

إفشاء

12/09/2026

الاعتدال

تمت الموافقة

إدخال

VDB-402848

EPSS

0.00000

KEV

لا

النشاطات

منخفض

المصادر

Are you interested in using VulDB?

Download the whitepaper to learn more about our service!